Defining healthcare assets
Define your organization's healthcare equipment as assets. Assets and properties work together to create a system. When assets and properties are linked to define a system then the entire system is affected by actions or movements of one individual piece. For example, if one piece of equipment breaks down, the entire system must be taken offline.
To define healthcare assets:
- Select Equipment > Assets Healthcare.
- Click New Record.
-
Specify this information:
- Organization
- Specify the organization to which the asset belongs if you use multi-organization security.
- Asset
- Specify a unique code identifying the asset, and then specify a description of the asset in the adjacent field. Specify the Equipment Details.
- Department
- Specify the asset's department.
- Operational Status
- Select the operational status of the asset.
- Loaned to Department
- Specify the department to which the asset has been loaned.
- PM WO Department
- Specify the department responsible for the PM work order if
different than Department.
Note: If the Department for the PM Schedules and Maintenance patterns work orders are blank, the PM WO Department will be used to generate works orders. Otherwise, the Department will be used.
- Type
- Select the asset type.
- Status
- Select the system status. The default status values include:
-
Awaiting
purchase
Interacts with the purchasing module. If assets are recognized at purchase order creation, then an asset must be created at time of purchase order generation. The ASSETASS installation parameter determines when assets are recognized: at receipt (R) or at purchase order creation (P).
- In store
Reserved for new assets received into a firm’s store. Select the Status value In store only when defining an asset in the inventory store.
- Installed
Assigned when an asset is in place and operating within the business organization.
-
Withdrawn
Assigned when an asset is no longer available for use. This status is not available during initial asset creation. The system automatically populates Withdrawal Date.
-
Awaiting
purchase
- Class
- Specify the class of the asset.
- Category
- Specify the asset's category or sub-class.
- Criticality Code
- Specify a criticality code to indicate the relative importance of the equipment to the overall production of goods or services for your system.
- Profile
- Specify the profile on which to base this asset record.
- Meter Unit
- Specify the asset’s primary unit of measure.
- Assigned To
- Specify the person responsible for the asset.
- Cost Code
- Specify the asset’s cost code.
- Safety
- Select to observe safety precautions when working with this equipment.
- Temperature Monitored
- Select if it is necessary or required to monitor the equipment's temperature.
- Out of Service
- Select if the asset is not used. The system automatically populates Withdrawal Date. Specify the Tracking Details.
- Manufacturer
- Specify the asset's manufacturer.
- Model
- Specify the asset's model number.
- Serial Number
- Specify the asset's serial number.
- Hardware Version
- Specify the hardware version.
- Software Version
- Specify the software version.
- Purchasing Asset ID
- Specify the code identifying the asset as associated to the purchasing department.
- Biomedical Asset ID
- Specify the code identifying the asset as a biomedical asset
- Revision
- Specify the manufacturer’s revision number.
- UMDNS Code
- Specify the code identifying the asset in the Universal Medical Device Nomenclature System™ (UMDNS) which is a standard international nomenclature and computer coding system for medical devices.
- OEM Site/System ID
- Specify the site and/or system identification for service companies and original equipment manufacturer for the asset.
- Vendor
- Specify the vendor.
- Coverage Type
- Select the maintenance coverage type for the asset. Select Calendar to indicate that the warranty is based on number of days used or Usage to indicate that the warranty is based on actual usage.
- X Coordinate
- Specify the X Coordinate for which GIS features should appear.
- Y Coordinate
- Specify the Y Coordinate for which GIS features should appear.
- Z Coordinate
- Specify the Z Coordinate for which GIS features should appear. Specify the Part Association Details.
- Part
- Specify the asset's part number.
Note: Only specify parts that are track by asset.
- Store
- Specify the store in which the asset is stocked.
- Bin
- Specify the bin storing the asset.
- Lot
- Specify the lot number, or batch, of the part. Specify the Compliance Association details.
- Lockout/Tagout
- Select if the asset equipment complies with OSHA regulations on lockout/tagout procedures. This regulation ensures machines are properly shut down and that they do not start again until service or maintenance on the machine is completed.
- Personal Protective Equipment
- Select if OSHA requires the use of personal protective equipment when operating the equipment to reduce exposure to hazards or injury.
- Confined Space
- Select if the equipment is located in an area defined as a confined space as per OSHA regulations.
- Statement of Conditions
- Select to indicate the asset's equipment relates to the Statement of Conditions as required by The Joint Commission.
- Building Maintenance Program
- Select to indicate the asset equipment is inventoried in the building maintenance program.
- HIPAA Confidentiality
- Select to indicate the asset equipment contains confidential patient health information and the equipment must comply with regulations. Specify the Hierarchy Details.
- Parent Asset
- Specify the parent asset of the equipment or asset.
- Dependent
- Select if the asset is dependent on the parent asset.
- Cost Roll-up
- Select if costs should roll up to the parent asset.
- Property
- Specify the property location of the asset.
- Dependent
- Select if the asset is dependent on the property.
- Cost Roll-up
- Select if the costs should roll up to the parent property of the child asset. Specify the Financial and Disposition details.
- Ownership Type
- Select the ownership details of the asset equipment. For example, select Lease if the equipment is leased.
- Inventory Verification Date
- Select the date the equipment was last verified for inventory purposes.
- Equipment Value
- Specify the value of the equipment to define with this system.
- External PO No.
- Specify the purchase order number for which the part was received from an external vendor.
- Purchase Date
- Select the purchase order date.
- Original Receipt Date
- Specify the original receipt date.
- Latest Receipt Date
- Specify the most recent receipt date.
- Original Install Date
- Specify the original install date.
- Latest Install Date
- Specify the most recent install date.
- Purchase Cost
- Specify the purchase cost of the part.
- Commission Date
- Specify the commission or startup date of the asset. Commission Date defaults to the current date when you create an asset.
- Cost of Needed Repairs
- Specify the cost of necessary repairs. The system automatically populates the currency, and defaults Eligible for Energy Star Label to unselected.
- Replacement Value
- Specify the current replacement value for the equipment. The system automatically populates the currency.
- Facility Condition Index
- Specify the resultant FCI based on the maintenance details. Cost of Needed Repairs/Current Replacement Value=FCI
- Disposal Type
- Specify the manner in which the asset was disposed.
- Disposal Date
- Specify the date on which the asset is sold, scrapped, or disposed. Specify the Facility Details.
- Primary Use
- Specify the primary use for the asset.
- Year Built
- Specify the year the asset was built.
- Floor Area
- Specify the floor area, and then specify the unit of measure for the floor area.
- Service Life (years)
- Specify the service life of the asset. Specify the Risk Assessment Details.
- Lock Risk Assessment Values
- Select to lock the reliability ranking values for the
equipment on the Risk Assessment tab of the Equipment screen.
Note: If Lock Risk Assessment Values is selected, the system will not allow the user to modify the risk assessment survey answers and calculate risk assessment values for the equipment. The system also prevents the selection of equipment for update on the Batch Update Risk Assessment Values form.
- Risk Assessment
- Specify the risk assessment code for the equipment.
Note: The system automatically populates Risk Assessment Index, Risk Assessment Score, Risk Assessment Values Out of Sync, Risk Assessment Values Last Calculated, Risk Assessment Survey Last Updated, and Risk Assessment Setup Last Updated, after answering the risk assessment survey.
- Click Save Record.