Entering meter readings for logical meters

To enter meter readings for logical meters:

  1. Select Equipment > Assets.
    Select Equipment > Positions.

    Select Equipment > Systems.

    Select Equipment > Setup > Locations.

  2. Select the equipment for which to enter meter readings, and then click the Meters tab.
  3. Select the meter for which to enter a reading, and then click Enter Meter Reading.
    Note: You can enter a reading for a date that is earlier than the last reading date. The value for the new reading must be between the prior and subsequent readings. For example, if there are previous readings for August and October, you can enter a new reading for September. If the reading in August was 100 and the reading in October was 200, then the reading entered for September must be between 100 and 200.
  4. Specify this information:
    Entry Type
    Choose one of the entry types:
    • Reading

      Specify the current meter reading for Value.

    • Difference

      Specify the difference between the last reading and the current reading for Value.

    • Date/Time

      Specify the date and time of the meter reading.

    • Value

      Specify the meter reading value.

    Date/Time
    Specify the date and time for the meter reading.
    New Value
    Specify the new value for the meter reading.
    Work Order
    Specify the work order. The system automatically populates Related Work Order if a related work order exists.
  5. Click Submit.