RCM potential yearly savings
Description
This report displays equipment or non-critical assets up to a certain risk level with PM and maintenance pattern cost information attached. The costs are converted to an annual budget and provide data on potential savings in the case where preventive maintenance is not performed on non-critical assets.
Only assets with the maximum risk level or lower threshold risk levels are selected and displayed.
Menu Path
Parameters
Specify the Organization, RCM Project, Maximum Risk Level, and Equipment.
- Years Included in Avg.
- Specify the number of years to include in the average costs per PM or maintenance pattern.
- Include Children
- Select to include the children of the selected equipment in the report.
Report Type
Basic