Adding equipment to maintenance patterns
To add equipment to maintenance patterns:
- Select Work > WO Planning > Maintenance Patterns.
- Select the maintenance pattern for which to add equipment, and then click the Equipment tab.
- Click Add Equipment.
-
Specify this information:
- Equipment
- Specify the equipment to add to the maintenance pattern. The
system automatically populates the equipment description and
Equip. Org.,
Status,
Test Point Set,
Dormant Start,
Dormant End and
Reuse Dormant Period
from the selected equipment record.
Note: The system will not display equipment with logical meters flagged as Up/Down Meter on the Meters page of the equipment record.
- Test Point Set
- Specify the test point set for calibration of the equipment.
- Dormant Start
- Specify the date on which the dormant period for the PM begins.
- Dormant End
- Specify the date on which the dormant period for the PM ends.
- Reuse Dormant Period
- Select to use the same specified dormant period for the PM on a yearly basis.
- Date Deactivated
- Specify the date after which work order generation stops.
- WO Department
- Specify the department of the work order.
- WO Location
- Specify the location of the work order. The system automatically populates WO Loc. Org.
- WO Cost Code
- Specify the cost code of the work order.
- WO Assigned To
- Specify the person responsible for the work.
- WO Assigned By
- Specify the person assigning the work.
- Work Order Org.
- Specify the organization of the work order.
- Due Date
- Specify the due date of the first work order. The system automatically populates Perform After, perform after UOM, and Meter #1 Due Date.
- Meter #1 Due
- Specify the reading due value for the first meter. The system automatically populates Meter #1 Interval, meter #1 UOM, and Meter #2 Due Date.
- Meter #2 Due
- Specify the reading due value for the second meter. The system automatically populates Meter #2 Interval and meter #2 UOM.
-
Click
Submit. The system
automatically populates
Insertion Date.
Note: If you populate any of the replacement values (e.g., WO Department, WO Location, WO Cost Code, WO Assigned To or WO Assigned By), the system replaces default values from the equipment record when a maintenance pattern work order is created with these replacement values.
To activate a maintenance pattern for equipment, click Activate MP.
To deactivate a maintenance pattern for equipment, click Deactivate MP.