Setting up revision control for permits
Designate which permit fields, tabs, and link buttons the system will protect when isolation point revision is not Unfinished.
To set up revision control for permits:
Designate which permit fields, tabs, and link buttons the system will protect when isolation point revision is not Unfinished.
To set up revision control for permits: